Projects

Site: Carnival UK Head Office, Southampton

Project Details: Our client approached us with an issue caused by low level winter sun coming through their existing open weave blinds. After discussion, we decided that the best resolution was to install a secondary blind in front of the existing blinds, giving them more options to create the best working environment for their employees. We installed 404 40mm Side Chain Operated Roller Blinds with Primary Blackout Shale fabric in a 70mm deep open cassette. All Roller Blind chains and breakaways were set to very specific heights for ease of use and maintenance as per our clients requirements. Due to these offices being a busy working environment the work had to be carried out after 6pm. The job was completed in 5 evenings, on time with our clients’ requirements and to the exacting standards that they required.

Site: Royal Army Physical Training Corps, Aldershot

Project Details: We installed 3 no 18.3 metre wide 2 Way Curtain Tracks, suspended from existing ceiling supports, with 3 no pairs of 19 metre wide by 5.5 metre drop Curtains in Bolton Twill Black & Red fabrics to divide up the gym area into 4 sections. We also installed a further 2 pairs of 20 metre wide by 6 metre drop Curtains in Bolton Twill Black & Red fabrics to  existing Curtain Tracks in another gym area. Rope Tie-backs were made on site & installed to all Curtains. All work was carried out from a mobile tower.

Site: Solent University, Southampton

Project Details: We installed 16 Hardwired Motorised Roller Blinds with Dart Grey fabric. The blinds were installed to 12 metre high windows in the main entrance & work was carried out from a Compact Crawler Boom. The blinds were installed to the selected windows to stop the sun from falling onto the reception desk.